Refined Elegance Shapewear – Sculpt Silhouettes, Redefine Grace
Refined Elegance Shapewear – Sculpt Silhouettes, Redefine Grace Refined Elegance Shapewear – Sculpt Silhouettes, Redefine Grace
Cart(0)
Home Shapewear Series Shaping Shorts
Product Details
"

Let this shapewear be your secret weapon for disguising unwanted lumps and bumps. With this spectacular Kurvas everyday use Fajas for women have a sensational silhouette. Feel confident wearing your favorite outfit. Get this incredible body shaper and look a smooth and flawless figure anytime you want.

  • Made of Powernet.
  • High compression.
  • This is an all-in-one postpartum and post-surgery garment
  • Built-in bra that offers control and support to your bust.
  • Sliding fabric so is easier to ""go"" while you're recovering.
  • Medium compression provides an incredibly slender fit.
  • A high-back design that will cover your figure and correct the posture.
  • Mid-thigh design so can confidently wear your regular clothing after surgery.
  • It gives your body a natural butt-lifting effect.
  • Offers ideal tummy control.
  • Also great after lipo and BBL procedures.
  • Lining made of Nylon.
  • Nylon lining in the butt area.
  • 3 levels of hook-and-eye compression closure.
  • Wide straps.
  • Mid-thigh length with silicone lace bands.
  • "
Kurvas CH007BF | Daily Use Best Everyday Shapewear Medium Compression & High-Back Design
  • XS
  • S
  • M
  • L
  • XL
  • 2XL
  • 3XL
  • 4XL
  • Beige
  • Black

$ 0.00

$ 11.99

Please select combo product attributes
The combo subtotal is $,SAVE$
Unavailable
You May Also Like
Cart
Refined Elegance Shapewear – Sculpt Silhouettes, Redefine Grace
Your cart is currently empty.